Institution: | Delft University of Technology |
---|---|
Department: | |
Year: | 2016 |
Posted: | 02/05/2017 |
Record ID: | 2107596 |
Full text PDF: | http://resolver.tudelft.nl/uuid:7cc17367-f1e4-436b-8de4-79256a2bef7e |
In a predetermined system of work, architects are obliged to comply with the developer’s ‘maximum-profit’ way of working. This project proves that the whole process can be subverted by implementing small changes in standardized components. Be it a window, a ceiling, or the position of a unit in the building, it guarantees a better performance of the same ordinary building, while answering the client’s financial concerns, the contractor’s limited skill sets, and most importantly ensuring an architect’s personal design agenda. Advisors/Committee Members: Frausto, S., Weaver, T., Avissar, I..